|
1. 1.
|
Name:
|
UNIX CZ s.r.o.
|
|
|
1.2.
|
Country:
|
CZECH REPUBLIC
|
|
|
1.3.
|
Company registration date:
|
10 November 1999
|
|
|
1.4.
|
Legal address:
|
Praha 2, Legerova 1831/42,PSČ 120 00
CZECH REPUBLIC
|
|
|
1.5.
|
Office address:
|
Praha 8, Prvniho pluku 621/8a,PSČ 186 30
|
|
|
1.6.
|
Bank, settlement account, MFO, OKPO code
|
UniCredit
Bank Czech Republic a.s.,
Jugoslávská
29, 120 00 Praha 2, Czech Republic
číslo účtu: 503950040/2700 (EUR)
IBAN
CZ522700000000503950040
|
|
|
1.7.
|
Identification code
|
IČ: 261
27 466
DIČ: CZ26127466
|
|
|
1.8.
|
Phone, fax,
e-mail
|
tel./fax. + 420 246 030 169, mob. + 420 602 121 078,
e-mail: unixcz@volny.cz
|
|
|
1.9.
|
Maager name
|
Director – eng. Václav Březina
|
|
|
1.10.
|
Representation office in the CIS
|
Ukraine, 04070, Kiev, Borisoglebskya str.16/B, office 8
tel. + 38044 4173322, + 38044 4258117, fax. + 38044 4173130
e-mail:
unixua@ukr.net www.zaec.com.ua
Representative officer for the CIS – Mr. Sergey KOSENKO
|
|
|
1.11.
|
Company profile:
|
The UNIX CZ s.r.o. was
established in 1999 and currently it is the engineering organization and
supplier organization providing services mainly in the area of thermal and
nuclear energy production, monitoring and control systems including the
system integration and engineering support.
The company carries out activities in the
Czech and foreign markets in the following main areas:
·designing of thermal and nuclear power systems;
·production of monitoring and control systems;
·development of design documentation;
·organization and production of comprehensive equipment and material
supplies for the fuel and energy sector.
|
|
|
1.12.
|
Information about the previous supplies in the recent period.
|
Work description
|
Customer
|
Work execution period
|
|
|
International technical assistance program
for Ukraine, TACIS project on implementation of the 10B
concentration measurement system for South Ukraine NPP units 1, 2:
|
|
|
·Production of control cabinets
including: logical controller with the operator panels
|
MOSTRO
for SU NPP
|
2005
|
|
|
·Elaboration of design
documentation for production of I&C for the NPP
|
MOSTRO
for SU NPP
|
2005
|
|
|
·Elaboration of testing and
operation documentation for the boron concentration measurement system for
the NPP.
|
MOSTRO
for SU NPP
|
2005
|
|
|
·Preparation and development of
technical materials for elaboration of the Preliminary Safety Analysis Report
for the BCMS for the NPP.
|
MOSTRO
for SU NPP
|
2005
|
|
|
·Organization and conduct of EMC
testing and seismic testing of the BCMS at the NPP.
|
MOSTRO
for SU NPP
|
2005
|
|
|
1.13
|
Organization and execution of the equipment
and material supplies to the power
facilities in Ukraine.
|
|
1.14
|
·Organization and execution of supply of the boron concentration
measurement systems.
|
Khmelnytskyy NPP
|
2006
|
|
1.15
|
·Organization and execution of supply of the boron concentration
measurement systems.
|
Rivne NPP
|
2007
|
|
1.16
|
·Supply of special cables produced by KABEX a.s.
|
Rivne NPP
|
2007
|
|
1.16
|
·Supply of attached and submerged boron meters.
|
Rivne NPP
|
2008
|
|
1.16
|
·Supply of I&C equipment
|
Ministry of energy of Turkmenistan
|
2008
|
|
2.1.
|
Procedure of incoming inspection, storage and issue for production of
materials and components
|
The process of ensuring
procurement of high quality materials and services is established in the
"Quality manual" document, "Procurement" guideline and
"Evaluation of suppliers" procedure. The supplies are planed within
the orders. The declaration of conformance, catalogue sheets, and quality and
completeness certificates are prepared for each supply. The sub-suppliers are
selected in accordance with the "Evaluation of suppliers" document.
The extended incoming inspection of materials is performed for the supplies.
The materials stocking rules are defined in the "Quality manual"
document. The order manager ensures safe delivery of the goods to the
location defined for the order implementation.
|
|
|
2.2.
|
Procedure of accounting of claims and complaints to the product
quality and execution of the measures aimed at timely elimination of defects
identified in course of operation and prevention of their recurrence
|
The
discrepancy resolution is carried out promptly in accordance with the
"Quality manual" document and the "Procedure of incompliant
products management". The discrepancies are checked in by the quality
assurance group (within the organizational structure of each order).
Each
discrepancy is investigated by the discrepancy resolution group consisting of
the senior project manager, the order manager, a representative of technical
support group, the work supervisor and a representative of the quality
control division.
Depending on the nature of
the discrepancy the discrepancy resolution group can also include the
corresponding specialists of the Manufacturer and the Customer, if necessary.
In case when the design condition was not ensured or the quality and
completeness criteria of the output product were not fulfilled, or other
equipment of the Operating organization can be affected, or nuclear safety
can be affected, the Customer can be involved into the discrepancy resolution
by making a record in the assembling register. In accordance with the
"Quality manual" and the "Discrepancy elimination measures and
preventive measures" guideline the elimination measures can be
subdivided into short-term and long-term measures. The short-term discrepancy
resolution measures are defined by the working group manager; the other group
members approve them. The long-term discrepancy resolution measures are
defined by the working group periodically based on the analysis results of the
discrepancies occurring within the specific time period or within one order.
|
|
|
2.3.
|
Procedure of training, examination, evaluation of knowledge, admission
to work and accounting of all categories of employees involved in
manufacturing and quality control of the products dedicated for the nuclear
power facilities
|
Evaluation
of the personnel qualification for each order is carried out in accordance
with the rules specified in the "Quality manual" and in the
"Personnel training" guideline. All relevant documents on the
employees' qualification are stored at the HR inspector in the personal
folder of each employee. This information is available for review by the
Customer or the supervisory authorities. All documents related to training,
education and qualification of employees are registered in the Information
Systems programme. All senior employees of the company have access to this
programme.
Qualification requirements
to individual employees in course of the work execution are based on the
quality system's manuals "Designing", "Prompt personnel
management" and the guidelines "Principles of professional training
of the external suppliers' personnel".
|
|
|
2.4.
|
List and composition of the
quality management system standards defining the organizational measures and
identifying the officials responsible for qualitative execution of works at
all phases of goods production for NPP.
|
All
orders are implemented in accordance with the existing quality documents;
their hierarchy and succession are provided in the "Quality
manual". The basic working documentation related the order (or available
documentation that requires adaptation to the needs of the order) must be
developed, checked and approved in accordance with the methods specified in
the above quality documentation. In case if the Customer (End User,
regulatory authorities, design organization, etc.) participation in review
and approval of documentation is stipulated by the contract or by the
legislation in force, the order manager must ensure proper cooperation.
|
|
|
3.1.
|
Quality system
|
The
company management have formulated and documented the quality policy thus
ensuring its compliance with the company's objectives and commitments
regarding satisfaction of the customers' requirements and continuous
improvement of the quality management system efficiency in accordance with
the international quality standards.
|
|
|
3.2.
|
Certificates
|
·IQNet – ISO 9001:2000, No:
CZ-2337/2006
·CQS – ISO 9001:2000, No: CQS
2337/2006
|
|
|
4.1.
|
Partners
|
·"I&CEnergoa.s."
– a subsidiary production unit of CEZ: services in the area of designing,
supplying goods, installation and adjustment works for all thermal and
nuclear power plants in Czech Republic;
·"KabelovnaKABEXa.s."
– production of cables and conductors;
·"MOSTROa.s."
– production of valves for thermal and nuclear power
plants, oil and gas industry;
·"ATOM-ENERGO-PROJECT"
company – working design works for the energy sector, engineering support in
projects implementation;
·Enterprises of the
"Zaporozhye Nuclear Power Company" holding;
·Ministry of fuel and energy of
Turkmenistan.
|
|